Curtain wall units are then hoisted up from the loading platform by means of this monorail and electric chain block and place in position at floor edge for fixing to the pre installed anchor brackets.
Unitized curtain wall system installation pdf.
The vast majority of low to mid rise curtain walls are installed in this way.
To install fire insulation according to approved shop drawing at top part of concrete beam surface prior to curtain wall installation.
Ycu 750 tu unitized curtain wall system page ii 04 4013 01 effective date.
Since unitized curtain walls are the current state of the art in curtain wall technology designers consultants and contractors alike need to become familiar with these systems technical limitations so that we can develop effective designs that address their use for all areas of the building enclosure.
Move and stack boxes with proper support to prevent distortion.
Plan details vision spandrel.
General notes and guidelines f.
Ycu 750 tu unitized curtain wall system page 10 04 4013 00 effective date.
All aluminum anchors and aluminum components of the curtainwall system must be separated from the structural steel and concrete with a nylon separator or material of similar compatibility.
Hence it is essential to keep in mind the mode of transportation and installation while planning the depth of facade.
A desire for speed of.
Shipping facility ensures timely delivery of products.
Safely and swiftly you can expect our highly methodized system to follow through on its shipping promise.
8250xd unitized curtain wall system 11 21 2019 page 4 section 1.
Long pieces of aluminum hence the name stick are inserted between floors vertically and horizontally between vertical members to support and transfer the load of the glass back to structure.
The size of the unitized curtain walls are dependent on the floor to floor height of the building.
March 18 2016 installation notes 1.
April 22 2010 unit installation step 4 install l anchor note.
Possible installation solution standard element installation detail of standard bracket functionalities.
If fork lifts are used be especially careful about striking the boxes when lifting or moving.
If your project doesn t suit most of the criteria for a unitized system your other option is to use a stick built system.
Do not drop roll or drag boxes of aluminum framing.
For the purposes of these instructions sealant is to be defined as the following.
Individual installation of each component are not necessary as in sticky curtain wall system.
Here the reynaers aluminium cw 65 ef unitized façade system is employed to great effect.